Overview
Assigning technicians in ShopView connects specific jobs and repair lines to the people performing the work. Advisors can assign techs directly from a new or existing Work Order (WO) or through the Schedule, ensuring that workloads are balanced and time is accurately tracked.
Please note: ShopView does not limit the technicians from punching into a job they are not assigned to, this ensures technicians can move freely between the jobs without having to request access to a job to help out if needed.
How It Works
There are four main ways to assign a technician:
Where | When to Use | Result |
New Line modal | When creating a new WO or adding a new line, users can add up to 5 technicians | Assign tech immediately so the job shows in the Assigned view on the Schedule |
Existing Line (Edit Line modal) | When updating or changing assignments on existing work, users can add up to 5 technicians | Adjust techs if work is reassigned or a second tech is needed |
Lead Technician (WO card, top left of the WO) | When you would like one technician to own the work order. | The Lead Technician is assigned to the work order's unassigned lines, and new lines default to them. A line already assigned to a specific technician stays with that technician when the lead changes, a line whose time was logged against a task no longer moves, and choosing the same lead technician again no longer assigns the unassigned lines. The lead technician of an Invoiced or Paid work order can't be changed. You can also change the lead by dragging the work order in Tech View or Board View, or with Reassign lead technician from the work order's actions; when the outgoing technician has shifts scheduled, ShopView asks whether to Keep shifts or Clear shifts, and time already recorded is never touched. See Changing a Work Order's Lead Technician. |
Schedule | When planning or dispatching future work. Drag a work order from the side panel onto a technician and a day. The technician is scheduled and added to that line's labor roster at the same time, so the board and the work order stay in step. You can add more technicians within the Edit Line modal if needed. | Assign tech and job time block visually before work begins |
Each method ultimately links the technician record to a WO line, which controls visibility, time tracking, and workload distribution.
When an unassigned technician punches into a line, they will also be shown on the line and within the timesheets.
Step-by-Step Example
Assigning a Technician When Creating a New Line
From a new WO, after selecting a customer and asset, the New Line modal appears.
Complete the job details under “What are you doing?” and “Why are you doing it?”
Use the Technician dropdown to assign the tech responsible for this job.
Enter Labor Rate, Estimated Time, and check Is Line Authorized if applicable.
Click Save & Close or Save & Add Part to continue building out the WO.
Once the tech clocks onto the job, the WO automatically moves to In Progress.
Assigning or Changing a Technician on an Existing Line
Open the WO and go to the Lines tab.
Click on the line to open the Edit Line modal or select the three-dot menu next to the line and Edit Labor.
Use the Technician dropdown to assign or change the technician.
Save your changes.
Assigning a Technician Using the Schedule
Open the Schedule and find the work order in the side panel. You can search the panel or filter it by customer name, unit number, contact, assignment status, and other statuses.
Drag the work order onto a technician and a day.
The technician is scheduled and added to the line's labor roster. The board and the work order stay in step.
Not sure who is taking the job yet? Drop it onto a department to park it, then drag it onto a technician later.
Things to Note
Technicians do not need to be assigned to punch in for a job. Anyone with Time Clock on can press Start on an approved line, whether or not they are a technician.
As of the 26.47.0 release, the technician dropdowns (New Line, Edit Line, Edit Labor and Lead Technician) offer only staff whose Technician toggle is on in Settings, Staff, along with Time Clock on, an active account and enrollment at the location. Someone who is no longer a technician stays on the lines they already hold. See The Technician Toggle: Who Shows on the Board.
Up to 5 technicians can be assigned to a single line
Reassigning a tech after work has started will not delete existing time logs; the additional technician's time is logged whether they are assigned or not.
Dragging a work order onto the Schedule adds the technician to the scheduled line's labor roster. Every schedule change can be undone, and existing time logs are never removed by scheduling changes.
You can also reassign a work order's lead technician by dragging it between technicians in Tech View or Board View on the Work Orders page. On a work order's Lines tab, a line with scheduled technicians but no labor technician shows their names instead of Unassigned.
